Description of the work:

  • Works along and under two-lane carriageway
  • Along the N136 the construction of new connection to an existing dry weather sewer
  • Along and under the N18 renewal of the existing pressure line and removal of old pipeline under the bridge over the canal
  • Demolition of existing sewer water cleaning installation incl. inlet and outlet pipes
  • Construction of settling tanks and pumping station
  • Renewal of supply and drainage system
  • Removal of existing pressure line in asbestos cement under the bridge and in the verges.
  • Laying new pressure pipeline by drilling and trenching along the N18.