• Assembly of a cycle viaduct with 6 prefab bridge sections
  • Foundations for cycle bridge and viaduct using micropiles
  • On-site poured bridge connection with the Posthof Bridge
  • Construction of various retaining walls and sheeted trenches
  • Construction of a cycle route in concrete with an epoxy top layer
  • Renovation of the Posthof Bridge with adaptations for the cycle highway